
This space is used for the testing and packaging of OEM equipment developed by Fonontech for the semiconductor industry. The cleanroom is fully integrated into an existing office building, with large glass walls providing maximum visibility for visitors – a unique visual connection between high-end technology and transparency.
CSI took care of the entire process, from concept and design to engineering, construction, and validation. We applied our modular DFP98 wall system and DFC42 ceiling system, combined with energy-efficient FFUs for optimal air quality. The modular approach allowed us to not only build in record time – just two weeks – but also to guarantee maximum flexibility and future-proofing.
This assignment demonstrates how Cleanroom Systems International delivers complete turn-key projects with an eye for detail, speed, and quality.
In our working method Read more about how we manage projects from start to finish.
Are you active in the semiconductor sector and looking for a future-proof cleanroom solution within an existing office environment?
Leave your email address and download our Company Profile immediately.
Discover more about our company, our team, completed projects, and our own cleanroom systems, such as the DFP80 Cleanroom Wall System and the DFC78-O Cleanroom Walkable Ceiling System.
Curious? Download the Company Profile using the button below.