High-level quality: ISO5/6 cleanroom at HAWO in Rijssen

Delivery:

2025

Client:
Industry:

Semiconductor

Delivery:

2025

For HAWO, active as a machinist in the semiconductor industry, CSI realised a high-quality clean room.

Used for product cleaning and assembly, this ISO5/6 cleanroom had to be built in the middle of an operational production environment - a logistically challenging situation that required precision and flexibility.

Thanks to our modular approach and full offloading - from engineering to validation - we managed to deliver this project turnkey within just four weeks.

Construction on a storey floor required thoughtful planning and close coordination with the client.

This approach is perfectly in line with our way of working, which focuses on customisation, quality and future-proofing.

Would you also like to integrate a cleanroom into an existing production environment?

Let us think with you about a solution that suits your space and requirements.

Curious about our story?

Leave your email address and download our Company Profile immediately.

Discover more about our company, our team, completed projects, and our own cleanroom systems, such as the DFP80 Cleanroom Wall System and the DFC78-O Cleanroom Walkable Ceiling System.

Curious? Download the Company Profile using the button below.