
This project was taken care of from A to Z: from design and engineering to construction and maintenance. Our thoughtful approach and fast execution allowed the customer to be operational in a controlled, clean working environment at lightning speed.
The cleanroom is constructed with high-quality DFP 98 panels and equipped with a DFC 42 ceiling, which ensures optimum airtightness and efficient air distribution.
The added mezzanine offers additional functional space within the same floor area - a smart solution for maximum utilisation of available space.
Despite the short lead time, there were no technical or logistical peculiarities, testifying to a tightly directed project flow.
Our modular approach - from design and engineering to construction and care - ensures speed, quality and flexibility.
Read more about our approach on the working-page.
This brochure tells you how CSI realises innovative and reliable clean rooms for various sectors. Discover our working methods, technologies and practical experience.