
This project was taken care of from A to Z: from design and engineering to construction and maintenance. Our thoughtful approach and fast execution allowed the customer to be operational in a controlled, clean working environment at lightning speed.
The cleanroom is constructed with high-quality DFP 98 panels and equipped with a DFC 42 ceiling, which ensures optimum airtightness and efficient air distribution.
The added mezzanine offers additional functional space within the same floor area - a smart solution for maximum utilisation of available space.
Despite the short lead time, there were no technical or logistical peculiarities, testifying to a tightly directed project flow.
Our modular approach - from design and engineering to construction and care - ensures speed, quality and flexibility.
Read more about our approach on the working-page.
Leave your email address and download our Company Profile immediately.
Discover more about our company, our team, completed projects, and our own cleanroom systems, such as the DFP80 Cleanroom Wall System and the DFC78-O Cleanroom Walkable Ceiling System.
Curious? Download the Company Profile using the button below.